Nothing unusual about this process, just 2x4 framing, cutting and installation of TJI and floors.
| The lower floor partition walls |
| Lower floor partitions from above |
| TJIs and Timberstrand beams |
| TJIs on the first floor |
| Insulation and a sub-floor |
| BC's finest cedar! We'll be installing another one above to the main ridge beam. |
| Future view from the upper floor |
More postings when I get back!